City-public-transport-tram-is-moving-along-the-cable-Tilikum-Crossing-Bridge-cm

Metro Transportation Funding Task Force Testimony

By John A. Charles, Jr.

At the last meeting, there was a fair amount of discussion about how the proposed bond measure should be structured to reduce GHG emissions from the transportation network.

If that is the direction the committee prefers, then it implies that the bond measure should not fund any road expansion projects. But it also has implications for light rail construction.

According to the Draft Environmental Impact Statement (DEIS) for the SW Corridor project, the estimated energy consumption during construction of light rail will be 5,886,876 million Btu. The DEIS also asserts that the “one-time energy use required to construct the Light Rail Alternative would be offset by the project’s long-term, beneficial operational impacts.”

To determine if this is true, we can look at the estimated daily energy savings from rail operations. On page 4-129 of the DEIS, the following information is presented:

2035 Daily Vehicle Miles Traveled and Energy Consumption

Vehicle Type Daily VMT – No build option Million Btu/Day – No build option Daily VMT

Light Rail option

Million Btu/Day

Light Rail option

Passenger vehicle 51,474,286 249,084 51,415,071 248,798
Heavy-duty trucks 3,389,982 73,132 3,389,288 73,117
Transit bus 100,122 3,546 97,501 3,453
Light rail 19,189 1,247 21,200 1,377
TOTAL 54,983,579 327,009 54,923,060 326,745

 

Since the energy savings from light rail operation compared with the base case are quite small, it would take 61.09 years to overcome the GHG deficit caused by construction. Also, the useful life of the equipment is likely to be only 40 years, so replacing all the light rail cars and track system would create another energy deficit.

If you asked the Energy Trust of Oregon for a grant to install an energy conservation project with a 61-year payback, they would probably reject your request. Cost-effective energy efficiency projects need to have a payback period that is less than the lifespan of the equipment.

Given the over-riding goal of GHG reduction, I recommend that bond expenditures be limited to bike and pedestrian projects only. Among other things, this would drop the total cost by about 90%, which would greatly increase the chance of voter approval.

Click here for PDF version:

Metro Transportation Funding TF.testimony

Read Blog Detail

TriMet’s New Electric Buses Will Be Less Reliable, More Costly

By John A. Charles, Jr.

The TriMet board recently voted to replace the agency’s entire bus fleet with battery-electric buses by 2040. Since each electric bus is more than twice as expensive as a standard diesel bus, this decision will cost taxpayers more than $550 million in excess costs.

The electric premium might be worth it if there were significant benefits to switching fuels, but there aren’t. In fact, battery-powered buses are far less reliable than diesel or natural gas buses. According to a recent study by the Federal Transit Administration, battery electric buses in Seattle only traveled 2,771 miles on average between breakdowns; for diesel buses, it was 17,332.

Since moving passengers is TriMet’s primary job, this alone should have disqualified battery buses from consideration.

The primary motivation for TriMet seems to be reducing so-called “greenhouse gases,” but battery-powered buses offer no real air quality benefit. The buses must be charged from the utility grid, which is powered mostly by coal and natural gas. Even large wind farms are backed up every minute of the day by other sources such as gas and hydro dams. Using battery-electric buses simply changes where greenhouse gases are emitted, which is meaningless.

A better alternative would be renewable natural gas, derived from processing food waste or methane emissions from landfills. For this reason the Los Angeles County Metropolitan Transit Authority concluded in 2016 that it would switch its entire fleet to renewable natural gas buses because it would provide “approximately 39% greater reductions in GHG emissions at half the cost” when compared to electric buses.

Finally, TriMet has no way to pay for the electric bus conversion. The staff recommended buying the first 80 electric buses with combinations of federal grants and money from the new statewide employee tax, followed by a hoped-for legislative bailout sometime after 2022. That’s not a plan, it’s a fantasy.

TriMet has already been awarded ten battery electric buses through grants from the federal government. A more prudent option going forward would be to buy ten buses using other fuels—such as compressed natural gas and renewable natural gas—and then test them all head-to-head to measure reliability, emissions, noise, and passenger comfort.

This was a rash decision. The TriMet Board should admit that it made a mistake, and spend the next two years analyzing alternative fuels. If taxpayers are going to be forced to pay an extra half-billion dollars for new buses, there should at least be a good reason.

John A. Charles, Jr. is President and CEO of Cascade Policy Institute, Oregon’s free market public policy research organization. A version of this article appeared in The Portland Tribune on November 13, 2018.